Preparations
1. Safety Check: Ensure all operations are performed in a power-off environment, and wear appropriate personal protective equipment (PPE).
2. Read Manuals: Thoroughly review the robot manufacturer’s installation manual and safety guidelines.
3. Inspect Components: Verify that the cable carrier and its accessories are complete and undamaged.
Installation Steps
1. Position Mounting Points: Identify the start and end positions of the cable carrier.
2. Pre-Assemble Carrier: Pre-install the cable carrier while maintaining an appropriate bend radius.
3. Mount Brackets: Install support brackets at designated locations to ensure structural stability.
4. Install Telescopic Unit: Ensure smooth operation of the telescopic components.
5. Routing and Securing: Fix the cable carrier along the predefined path to avoid abrasion.
6. Connect Interfaces: Properly align and connect all electrical and pneumatic interfaces.
7. Inspect and Adjust: Confirm that the carrier moves freely without interference across the full range.
8. Functional Test: Power on and test all functions to validate normal operation.
Key Notes
- Follow the "flexible components before rigid ones" installation sequence.
- Ensure all fasteners are tightened to the specified torque.
- Periodically inspect the cable carrier for wear and perform timely maintenance.
Note: Translated with technical accuracy (e.g., "telescopic unit-style cable carriers"),
structured for clarity in procedural instructions, and aligned with industry standards for robotic system installations.
Critical safety and operational terms (e.g., "bend radius," "specified torque") are emphasized to match technical documentation conventions.